A: The most likely backfill with a concrete floor slab is either granular or sand. The international Building Code actually requires either concrete backfill or sand backfill, however, it has been found through experience that compacted, crushed 3/4 (-) rock is an excellent backfill. The presence of a floor slab also provides lateral support for the post.